50,000+ MW assessed across thermal, hydro and captive generation — Sasan, Adani, Essar, GMR, RattanIndia, Reliance Power and more. 40+ power-plant assignments.

50,000+ MW
Generating capacity assessed
₹2.7L+ Cr
Project cost across tabled power assignments
40+
Power-plant assignments

Sector overview

Thermal, hydro, gas and captive generation, assessed by our own engineers

Kakode & Associates has valued or monitored more than 50,000 MW of generating capacity: supercritical and subcritical coal plants, gas-based captive units, run-of-river and storage hydro, biomass and utility-scale solar. Assignments include the asset valuation of the 3,960 MW Sasan ultra mega power project for an SBI-led consortium, twelve Reliance Power hydro-electric projects totalling 5,172 MW, and stressed thermal assets valued for asset reconstruction companies and resolution professionals.

Reports are prepared by in-house electrical, mechanical and chemical engineers and presented to consortium lenders, Independent Evaluation Committees under RBI’s 5/25 flexible structuring scheme, and NCLT-appointed resolution professionals. Ind AS fair-value reporting has been delivered for the Rosa (1,200 MW) and Vidarbha (600 MW) plants.

Thermal power plant under constructionPhoto: Biswarup Ganguly · CC BY 3.0 · Wikimedia Commons

Industry challenges

What lenders ask us to test in this sector

Tariff and PPA risk on merchant and captive plants

Merchant exposure, PPA renegotiation and the gap between contracted and achievable tariffs decide whether debt service holds. We model plant-level cash flows under contracted, merchant and blended scenarios.

Fuel supply, linkage and coal-quality assumptions

Linkage status, e-auction dependence, imported-coal blending and calorific-value shortfalls move variable cost more than any other input. We verify fuel-supply agreements, logistics and delivered coal quality against the design basis.

Ageing assets: residual life and stranded-cost exposure

Residual life, plant-load-factor history, deferred maintenance and emission-norm retrofits determine whether an older unit is a going concern or a stranded cost. Our engineers inspect the boiler, turbine and balance of plant themselves.

Resolution of stressed thermal assets under IBC

Fair value and liquidation value for a thermal asset need a plant-specific view of restart cost, PPA transferability and regional demand, not a rule-of-thumb figure per megawatt.

Our solutions

How we help

Track record

Selected power assignments

ProjectCapacityServiceProject cost
Reliance Power, 12 hydro-electric projects (Arunachal Pradesh, Himachal Pradesh, Uttarakhand)5,172 MWAsset valuation₹35,000 Cr
Sasan Power, Madhya Pradesh (6 × 660 MW)3,960 MWAsset valuation for an SBI-led consortium₹25,000 Cr
KSK Group thermal project (6 × 600 MW)3,600 MWAsset valuation for a PFC-led consortium₹28,500 Cr
Lalitpur Power, Uttar Pradesh (3 × 660 MW)1,980 MWAsset valuation for an SBI-led consortium₹19,000 Cr
RKM Powergen, Chhattisgarh (4 × 360 MW)1,440 MWTEV of boiler erection and commissioning, Bank of Baroda₹8,640 Cr
GMR Chhattisgarh (2 × 685 MW)1,370 MWAsset valuation for an Axis Bank-led consortium₹7,660 Cr
Adani Power, Rajasthan (2 × 660 MW)1,320 MWAsset valuation for an IDBI-led consortium₹19,000 Cr
Essar Power MP (2 × 600 MW)1,200 MWAsset valuation for an SBI-led consortium₹9,200 Cr

In numbers

Capacity assessed in the largest single power assignments

  • Reliance Power hydro5,172 MW
  • Sasan Power3,960 MW
  • KSK Group3,600 MW
  • Lalitpur Power1,980 MW
  • RKM Powergen1,440 MW
  • GMR Chhattisgarh1,370 MW
  • Adani Rajasthan1,320 MW
  • East Coast Power1,320 MW

Installed or planned capacity in MW. Source: Kakode & Associates engagement records.

Case study

Selected mandates

Renewable Energy

Serentica Renewables India (KKR & Vedanta Group)

₹4,600+ Cr

Techno-Economic Viability study across two locations covering 152 MW wind, 500 MW solar and 600 MW of battery energy storage.

TEV Study

Infrastructure

Afcons Infrastructure

₹15,000 Cr

Project Monitoring Agency across ten concurrent national mandates including the Nagpur–Mumbai Expressway, Delhi–Meerut RRTS, the Rohtang Pass tunnel and the Mumbai–Pune Missing Link.

Project Monitoring

Construction

Shapoorji Pallonji

₹13,730 Cr

Project Monitoring Agency across ten construction projects including CIDCO Navi Mumbai, MHADA and the Karwar Naval Base.

Project Monitoring

Let’s evaluate your project.

A partner will respond within one working day.