Electric Mobility

E-bus manufacturing, operations and charging infrastructure. 8 EV and charging SPVs across 6 lender mandates.

₹5,000+ Cr
Cumulative project cost assessed
8
EV and charging SPVs
6
Lender mandates

Sector overview

One of the few established repeat practices in Indian e-mobility financing

Electric buses procured under gross-cost contracts, charging and depot infrastructure, and fleet special-purpose vehicles are a new asset class for Indian lenders, with no operating history to benchmark against. Kakode & Associates has completed techno-economic viability studies and monitoring for eight EV and charging SPVs across six lender mandates, with a cumulative project cost above ₹5,000 crore.

Each study is built from the contract outward: the availability and kilometre commitments the transit authority is buying, the penalty regime, the battery warranty and its conditions, depot and charger construction, and the sponsor’s ability to run the fleet at the uptime the payment mechanism assumes. Our engineers verify the vehicle, battery and charger specifications against the tender and the supply contract.

Electric buses at a depot in HyderabadPhoto: Kavali Chandrakanth KCK · CC0 · Wikimedia Commons

Industry challenges

What lenders ask us to test in this sector

Battery life, warranty and replacement cost

The battery is a third or more of the vehicle cost and will need replacement inside a typical loan tenor. We model degradation, warranty conditions and replacement capex explicitly rather than assuming the pack lasts the contract.

Gross-cost contract availability and penalty regimes

Gross-cost contracts pay for kilometres and availability, and deduct for every shortfall. We read the concession and model revenue on the penalty regime the operator will actually face.

Charging infrastructure as a new collateral class

Chargers, transformers and depot civil works have no established resale market. We value them on cost, condition and contract-specific usefulness, and say so in the report.

Fleet utilisation and uptime assumptions

Scheduled kilometres, dead mileage, charging windows and vehicle-to-route allocation decide whether the fleet earns its full payment. We test the operating plan against the schedule the authority has issued.

Our solutions

How we help

Case study

Selected mandates

Renewable Energy

Serentica Renewables India (KKR & Vedanta Group)

₹4,600+ Cr

Techno-Economic Viability study across two locations covering 152 MW wind, 500 MW solar and 600 MW of battery energy storage.

TEV Study

Infrastructure

Afcons Infrastructure

₹15,000 Cr

Project Monitoring Agency across ten concurrent national mandates including the Nagpur–Mumbai Expressway, Delhi–Meerut RRTS, the Rohtang Pass tunnel and the Mumbai–Pune Missing Link.

Project Monitoring

Construction

Shapoorji Pallonji

₹13,730 Cr

Project Monitoring Agency across ten construction projects including CIDCO Navi Mumbai, MHADA and the Karwar Naval Base.

Project Monitoring